CLIENT
Siemens
PROJECT
MRI rooms
CONTRACT VALUE
$1 million
CONTRACT PERIOD
8 weeks
Siemens Healthcare and MBS developed a strategy to supply off-site constructed modules to house MRI equipment at various hospitals around Australia. The design needed to accommodate transport restrictions and the size of the equipment to be installed. The concept was designed to minimise site time and allowed the modules to be manufactured in a controlled factory environment. Both parties worked together with design teams and finishing trades to provide the successful final product. This has meant that over three years, MBS has been able to supply modules of various sizes to Siemens Healthcare projects in Vermont, Mildura, Werribee and Warrnambool in Victoria and Mandurah in Western Australia. In most cases, the modules were transported to the site and installed in one day, with little disruption.
CRITICAL SUCCESS FACTORS
A cost effective solution was achieved MBSs production and delivery schedules ensured tight time frames were met